DATA CENTER TECHNOLOGY

The machines inside are only half the story.

Cooling, power, automation and construction methods determine how a campus performs—and how its benefits, costs and risks reach the surrounding community.

THE TECHNOLOGY STACK

Six connected systems shape the campus.

A strong proposal explains how these systems work together. A change in cooling can affect water, electricity, noise, building design, maintenance and workforce needs.
01

Cooling

Air, direct-to-chip liquid, immersion, dry and hybrid heat-rejection systems.

02

Power

Utility interconnection, substations, backup systems, storage, generation and controls.

03

Automation

Sensors, building controls, digital twins, predictive maintenance and robotic inspection.

04

Modular delivery

Factory-built electrical rooms, cooling skids and repeatable structural assemblies.

05

Construction robotics

Automated layout, scanning, material placement and additive construction.

06

Heat reuse

Capturing useful heat for a real nearby demand—not simply labeling it recoverable.

COOLING DECISIONS

Every cooling choice moves heat somewhere.

No label settles the water-versus-energy question. Compare the complete system at the proposed rack density and Texas design conditions.
Widely deployed

Air + evaporative

Where it helps
Familiar equipment and operating practices; evaporative heat rejection can reduce cooling electricity.
What it trades
Cooling-tower water use and blowdown can rise in hot weather. Airflow management still matters.
What to verify
Peak-day potable and non-potable use, WUE, cycles of concentration and drought operating mode.
Scaling for dense compute

Direct-to-chip liquid

Where it helps
Moves heat close to high-density processors and can support warmer facility water loops.
What it trades
The captured heat still needs a rejection system. “Liquid cooled” does not by itself mean zero water.
What to verify
Rack density, coolant loop, heat-rejection equipment, leak controls and service procedures.
Project-specific

Immersion

Where it helps
Submerges equipment in dielectric fluid and can reduce fan energy at very high heat densities.
What it trades
Hardware compatibility, fluid handling, maintenance workflow and supply-chain support require review.
What to verify
Fluid specification, equipment warranty, fire and spill controls, replacement process and end-of-life plan.
Climate-sensitive

Dry + hybrid rejection

Where it helps
Can sharply reduce onsite cooling water use and preserve water during drought stages.
What it trades
Hot Texas conditions can increase fan energy, equipment size or the need for a hybrid operating mode.
What to verify
Design temperature, annual energy model, hours in each mode, noise and maximum summer demand.
PUETotal facility energy ÷ IT equipment energy
WUEAnnual site water use ÷ IT equipment energy

Useful metrics—when disclosed with boundaries, time period, source water and peak-day conditions.

POWER + THE TEXAS GRID

Capacity is a plan, not a promise.

ERCOT reported roughly 474 GW of large-load requests in July 2026, about 90% associated with data centers. Requests are not the same as operating projects, and grid studies determine what can connect, when and under what conditions.
01

Utility service

New transmission, substations and phased energization must match a studied interconnection—not an announcement headline.

02

Ride-through + backup

UPS systems and batteries bridge short events; longer backup may use generators or other firm resources.

03

Onsite supply

Solar, storage, turbines, engines, fuel cells or microgrids can serve defined roles, subject to fuel, emissions and reliability limits.

04

Flexible operations

Controls may shift or reduce suitable workloads during grid stress, but the committed amount, notice time and verification matter.

TEXAS POLICY SIGNAL · JULY 2026

State direction calls for data centers to fund infrastructure needed to serve them and for new large loads to avoid shifting expansion costs onto residential customers.

Read the state update ↗

MODULAR DELIVERY + AUTOMATION

Move repeatable work earlier. Keep accountability local.

Prefabrication and robotics can improve repeatability, safety and schedule control. They do not remove the need for engineering, skilled trades, inspection or commissioning.
1

Factory-built systems

Power rooms, switchgear, cooling skids and other assemblies can be built and tested away from the site.

2

Digital coordination

Models, reality capture and automated layout can expose conflicts before work is installed.

3

Robotic work

Scanning, inspection, material movement and repetitive fabrication can complement skilled trades.

4

Site integration

Civil work, utility service, commissioning, fire protection and code approval remain local and project-specific.

WORKFORCE EFFECT

Automation changes the task mix. It does not eliminate the need for people.

Training should connect construction craft, electrical systems, controls, digital models, materials and operations.

Liquid-cooling technicianElectrical and substation technicianControls and instrumentation specialistCommissioning technicianWater-treatment operatorRobotics operator and maintainerBIM / digital-layout coordinatorQuality and materials technician

BUILT PRECEDENT + CURRENT PLATFORM

Separate what has been built from what is proposed.

The Wave House proves a printed exterior-wall application for a data-center building. RIC documents robotic construction equipment and projects; any Texas use still requires project-specific validation.
BUILT · HEIDELBERG, GERMANY

Wave House data center

PERI reports that the 54-meter commercial building was completed with 170 hours of pure printing time. The project demonstrates printed walls—not a fully printed data-center system.

Review the project source ↗
PLATFORM · RIC TECHNOLOGY

Mobile robotic construction

RIC publishes equipment, software and project examples for robotic additive construction. Equipment claims should be verified against the selected machine and job conditions.

Explore the platform ↗

RESPONSIBLE ADOPTION

New technology still has to earn its place.

✓ Engineered for the use✓ Code pathway identified✓ Materials tested✓ Total cost compared✓ Operators trained✓ Quality documented
Public education and commercial work are separate.

DataCentersTX.com explains technologies and decision criteria for the public. COH 3D Construction is a commercial project offering. Inclusion on this page is not a certification, code approval or performance guarantee for any machine, material or project.

PRIMARY SOURCES

Start with the public record.

These sources support the technology and Texas-policy context above. Commercial equipment pages are identified separately in the 3D-construction section.

Evaluate the complete system—not the slogan.

Community review questionsDiscuss a project →